Revision and Routing Costing Defaults

Costing for an Item can be set by default for a specific Revision and Routing.

Revisions

ProcessForce can cost a product at a revision level.

Within the Item Details form, select the Revision for cost calculation and check the field "Is Costing Default."

Costing Default Revision

Click here to find out more about Item Details.

Production Process

  • Multiple routes can be defined for a product.
  • To include the costs of the resources defined within the route, select and check which routing is the default for cost calculation.
  • If there is a single route, it is still required to check the field.

Production Process Default Costing