Date Details tab
On this tab, you can set details about Batch dates, e.g., date of admission, expiry, consumption, and inspection dates.
Admission – date of admission to Warehouse (for manufactured Items, this is the date of manufacturing, for purchased Items, this is the date of Goods Receipt PO).
Vendor Manufacturing Date – date of manufacturing used for purchased Items.
Expiry Date, Consume by Date, Inspection Dates – click here to learn more about these dates and their calculation method.
Best Before Date – the date before the product still keeps its highest quality. This data is often used in food distribution industries. The date in this field is set up manually.